Case study

This is a group assignment. Students should form themselves into groups of 2 or 3 and post a forum entry in the “group nomination forum”. This assignment must be completed within the packet tracer application.

Part 1                                                     

For each location, a LAN must be set up. Different VLANs should be used to separate Engineering, Design and Finance departments at each site. All devices on these LANs must be able to communicate with each other as well as with devices located at the other sites.

Each employee has one computer connected to the computer networking. The number of employees is as follows:

1. Head office will have 53 employees in total, 8 Design Staff, 40 Engineering Staff and 5 Finance staff.

2. Office A will have 23 employees in total, 4 Design staff, 18 Engineering Staff, and 1 Finance staff.          

3. Office B will have 12 employees in total, 7 Design staff, 4 Engineering Staff, and 1 Finance staff.

In addition to LAN connectivity at each site, each site must be able to communicate with other sites via Serial point to point links in a hub and spoke topology, with Head Office being the hub and both Office A and Office B links terminating at the Head Office. Head office will provide the clocking rate on the Serial links for all other sites.

Serial point to point link details are as follows:

1. London to Darwin link speed  =  2 Mbps

2. London to Perth link speed  = 1 Mbps

Create an IP addressing plan that includes each of the three sites as well as the two WAN links from the following network allocation:

172.16.0.0/24

The addressing plan must be created such that no addresses are wasted, i.e. the smallest subnets large enough for the given number of employees should be used at each site.

Local Area Network Design and Implementation Assignment Help, ICT546 Assignment help, ICT546

Part 2

Create the POC. The hardware list for POC is as follows:

Head Office

1. One 2811 Router with sufficient WIC-1T modules installed in the chassis to cater to all WAN connectivity requirements and sufficient NM-2FE2W modules installed to provide enough Fast Ethernet ports to cater to all network segments within a site;

2. Three 2960-24TT switches;

Office A and Office B

1.  One 2811 Router with sufficient WIC-1T modules installed in the chassis to cater to all WAN connectivity requirements and sufficient NM-2FE2W modules installed to provide enough Fast Ethernet ports to cater to all network segments within a site;

2. One 2960-24TT switch;

3. One test PC for each of the three departments.

VLANs and inter-VLAN routing must be set up for each site. Furthermore, routing must be set up between the different sites to allow them to communicate with one another. Choose a suitable routing strategy and justify your choice.

Basic device configuration must be carried out on all routers and switches. This includes configuring hostnames as well as login passwords, enable passwords and enabling password login on all consoles and virtual terminals. Username and passwords must be documented. On switches, all unused ports should be shut down for security reasons. Unused ports are ports where there are no employee PCs connected, as we have more switch ports than employees. Connectivity between all departments at all sites should be verified using common testing tools. The test plan and outcomes of the testing must be documented

Deliverables

The deliverables consist of a PDF report and a Packet Tracer File.

The PDF report must include:

1. A cover page featuring the assignment title and the names and student numbers of all group members

2. Executive summary - A single page summarizing your document. This should not feature too much technical content but should enable someone who is unfamiliar with the project to gain a quick appreciation of what has been achieved. If there are any important assumptions or features these should be highlighted. (Marks based on clarity and effective communication)

3. Technical documentation – You need to communicate in the clearest possible manner, the IP addressing structure, VLAN setup, routing setup and other configuration (passwords!) that you have developed. You are given considerable flexibility and you should take care to put yourself in the reader’s position and produce a document that communicates efficiently. This will be a compromise between an exhaustive coverage of every tiny detail and an easily understood overview that lacks detail. (Marks based on technical correctness, good design and effective communication of the design)

4. Testing strategy – You must test your implementation and outline the procedures that you undertook as well as the testing outcomes. If any elements of your design do not work please discuss them here. Think about connectivity, routing, and efficiency when testing your network. Please don't provide screenshots of successful pings. (Marks based on thoroughness of testing approach and identification of errors)

Packet Tracer File:

Within the Packet Tracer environment, implement the network in accordance with the assignment requirements and equipment limitations.
In the case of hosts, implement only one host per department per site, unless more is required for testing purposes.
Name and document all devices as appropriate

Challenges that students may face in completing this assignment

Students face many feedbacks and challenges in Local Area Network Design and Implementation Assignment. It is very important to keep momentum to achieve better grades in your exams for this assignment. OZ Assignments provide necessary academic guidance and tutorial help to resolve student queries. Get feedback amendment without any additional cost.